Plan of the development of normative documents
Plan of the development of normative documents for 2023
(updated on 10. 5. 2023)
Serial number |
ND number | ND name |
---|---|---|
1 | TDG 983 01 Amendment 2 |
Injection of biomethane into gas infrastructure. Requirements for quality and measurement presumption of release: 2023 |
2 | TPG 605 02 revision |
Gas pressure regulating stations, regulating devices presumption of release: 2023 |
3 | TPG 700 02 Amendment 1 |
Determination of the technical state of steel pipelines. Diagnostic methods presumption of release: 2023 |
4 | TPG 700 03 Amendment 1 |
Conditions for realizing the works and locating the building structures in protective zones and for the locating the building in safety zones of gas installations and gas infrastructure presumption of release: 2025 |
5 | TPG 702 04 Amendment 2 |
Gas mains and service pipelines of steel for maximum operating pressure up to 100 bar included presumption of release: 2025 |
6 | TPG 702 09 Amendment 1 |
Repairs off steel mains and services pipelines for maximum operating pressure over 5 bar up to and including 40 bar presumption of release: 2024 |
7 | TPG 703 01 revision |
Industrial gas installation pipework presumption of release: 2024 |
8 | TPG 811 01 revision |
Fuel gas engine assembly. Installation and operation presumption of release: 2023 |
9 | TPG 900 01 revision |
Terminology and abbreviations in the gas industry presumption of release: 2024 |
10 | TPG 902 02 consolid. version / Amendment 4 |
Quality and testing of gaseous fuels with high methane content presumption of release: 2023 |
11 | TPG 905 01 revision |
Basic requirements for safety in the operation of the gas installations presumption of release: 2023 |
12 | TPG 920 25 revision |
Mitigation of the corrosion effects of stray and interference currents on the buried structures presumption of release: 2023 |
13 | TPG 923 01 revision |
Certification of processes. Testing the professional level and working qualities in the field of gas installations presumption of release: 2023 |
14 | TPG 927 04 revision and merging |
Testing of the plastics pipe welders for purposes of certification their competencies presumption of release: 2023 |
TIN 927 07 revision and merging |
Welding plastics. Professional courses for plastics welding operators presumption of release: 2023 |
|
15 | TPG 927 06 revision |
Welding plastics. Training Courses of Superior welding operator's staff presumption of release: 2023 |
16 | TPG 935 01 Amendment 1 |
Section valves on steel gas pipelines presumption of release: 2024 |
17 | TPG 983 03 new |
Connection of renewable gas plants (hydrogen and biomethane) to natural gas pipelines presumption of release: - |
Plan of the development of normative documents for 2022
(update 13. 4. 2022)
Serial number |
ND number | ND name |
---|---|---|
1 | TPG 304 02 Amendment 1 |
Refueling CNG stations for motor cars presumption of release: 2022 |
2 | TPG 703 01 revision |
Industrial gas installation pipework presumption of release: 2024 |
3 | TPG 704 01 revision |
Gas installation pipework and appliances for buildings paused |
4 | TPG 811 01 revision |
Fuel gas engine assembly. Installation and operation presumption of release: 2023 |
5 | TPG 901 01 consolid. version |
Conversion the gas supplies into energy units presumption of release: 2022 |
6 | TPG 902 02 consolid. version/Amendment 4 |
Quality and testing of gaseous fuels with high methane content presumption of release: 2022 |
7 | TPG 905 01 revision/Amendment 2 |
Basic requirements for safety in the operation of the gas installations presumption of release: 2022 |
8 | TPG 918 01 revision |
Odorization of natural gas presumption of release: 2022 |
9 | TPG 918 02 cancellation |
Specific requirements for odour of natural gas and methods for testing presumption of approval: 2022 |
10 | TPG 920 25 revision |
Mitigation of the corrosion effects of stray and interference currents on the buried structures presumption of release: 2023 |
11 | TPG 923 01 revision |
Certification of processes. Testing the professional level and working qualities in the field of gas installations presumption of release: 2023 |
12 | TPG 927 04 TPG 927 05 TPG 927 07 revision and merging |
Testing of the plastics pipe welders for purposes of certification their competencies Courses for welding and adhesive bonding of plastics Welding plastics. Professional courses for plastics welding operators presumption of release: 2023 |
13 | TPG 927 06 revision |
Welding plastics. Training Courses of Superior welding operator's staff presumption of release: 2023 |
14 | TPG 983 03 new |
Connection of renewable gas plants (hydrogen and biomethane) to natural gas pipelines presumption of release: 2023 |
Plan of the development ND – 2021
(updated on 11. 6. 2021)
Serial number |
ND number | ND name |
---|---|---|
1 | TPG 205 01 revision |
Systems for storage of gases in gaseous state (gasholders) presumption of approval: 2021 |
2 | TPG 700 03 revision |
Conditions for realizing the works and locating the building structures in protective zones and for the locating the building in safety zones of gas installations and gas infrastructure presumption of approval: 2022 |
3 | TPG 702 01 Amendment 2 |
Gas mains and service pipes of polyethylene presumption of approval: 2021 |
4 | TPG 702 04 Amendment 1 |
Gas mains and service pipelines of steel for maximum operating pressure up to 100 bar included presumption of approval: 2021 |
5 | TPG 704 01 revision |
Gas installation pipework and appliances for buildings presumption of approval: 2022 |
6 | TPG 800 00 cancellation |
System of gas fuel combustion appliances category presumption of approval: 2021 |
7 | TPG 902 02 Amendment 3 |
Quality and testing of gaseous fuels with high methane content presumption of approval: 2021 |
8 | TPG 905 01 Amendment 2 |
Basic requirements for safety in the operation of the gas installations presumption of approval: 2021 |
9 | TPG 920 21 Amendment 2 |
Corrosion protection of underground steel constructions. Selection of coating systems presumption of approval: 2021 |
10 | TPG 920 22 revision |
Corrosion protection of buried steel installations. Operation and maintenance of active corrosion protection facilities presumption of approval: 2021 |
11 | TPG 923 01 revision |
Certification of processes. Testing the professional level and working qualities in the field of gas installations presumption of approval: 2021 |
12 | TIN 930 01 cancellation |
Storage and handling of products for polyethylene gas pipelines presumption of approval: 2021 |
13 | TPG 935 01 revision |
Section valves on steel gas pipelines presumption of approval: 2021 |
14 | TPG 982 01 revision |
Garage, service, repair shop and other place facility for the NVG´s presumption of approval: 2022 |
15 | TDG 983 01 Amendment 1 |
Injection of biomethane into gas infrastructure. Requirements for quality and measurement presumption of approval: 2021 |
Plan of the development of normative documents for 2020
(updated on 19 June 2020)
Serial number |
ND number | ND name |
---|---|---|
1 | TPG 205 01 revision |
Zařízení pro skladování plynů v plynné fázi (plynojemy) předpoklad schválení: 2021 |
2 | TPG 304 03 Nová |
Výstavba a provoz plnicích stanic stlačeného vodíku pro mobilní zařízení předpoklad schválení: 2020 |
3 | TPG 609 01 Amendment 1 |
Regulátory tlaku pro vstupní tlak do 4 bar včetně. Umisťování a provoz předpoklad schválení: 2020 |
4 | TPG 702 04 Amendment 1 |
Plynovody a přípojky z oceli s nejvyšším provozním tlakem do 100 bar včetně předpoklad schválení: 2021 |
5 | TPG 702 06 cancellation |
Přerušení průtoku plynu v plynovodech uzavíracími balony předpoklad schválení: 2020 |
6 | TPG 702 08 revision |
Opravy ocelových plynovodů a přípojek s nejvyšším provozním tlakem do 5 bar včetně předpoklad schválení: 2020 |
7 | TPG 704 01 Amendment 1 |
Odběrná plynová zařízení a spotřebiče na plynná paliva v budovách předpoklad schválení: 2020 |
8 | TPG 704 01 revision |
Odběrná plynová zařízení a spotřebiče na plynná paliva v budovách předpoklad schválení: 2021 |
9 | TPG 905 01 Amendment 1 |
Základní požadavky na bezpečnost provozu plynárenských zařízení předpoklad schválení: 2020 |
10 | TPG 921 02 revision |
Vizuální hodnocení svarových spojů na plynárenských zařízeních předpoklad schválení: 2020 |
11 | TPG 920 23 revision |
Ochrana kovových objektů a zařízení proti atmosférické korozi předpoklad schválení: 2021 |
12 | TPG 923 01 revision |
Certifikace procesů. Ověřování odborné úrovně a kvality práce v oblasti plynárenských zařízení předpoklad schválení: 2020 |
13 | TIN 930 01 cancellation |
Skladování a manipulace s výrobky pro výstavbu plynovodů z polyetylenu předpoklad schválení: 2020 |
14 | TPG 935 01 revision |
Trasové uzávěry plynovodů z ocelových trub předpoklad schválení: 2020 |
15 | TPG 982 01 revision |
Vybavení garáží a jiných prostorů pro motorová vozidla s pohonným systémem CNG předpoklad schválení: 2021 |
Plan of the development of normative documents for 2019
(updated on 29 April 2019)
Serial number |
ND number | ND name |
---|---|---|
1 | TPG 304 02 revision |
Plnicí stanice stlačeného zemního plynu pro motorová vozidla předpoklad schválení: 2020 |
2 | TPG 304 03 Nová |
Výstavba a provoz plnicích stanic stlačeného vodíku pro mobilní zařízení presumption of approval: 2020 |
3 | TPG 702 01 Amendment 1 |
Plynovody a přípojky z polyetylenu předpoklad schválení: 2019 |
4 | TPG 702 04 revision |
Plynovody a přípojky z oceli s nejvyšším provozním tlakem do 100 bar včetně předpoklad schválení: 2019 |
5 | TPG 702 08 revision |
Opravy ocelových plynovodů a přípojek s nejvyšším provozním tlakem do 5 bar včetně předpoklad schválení: 2019 |
6 | TIN 702 10 revision |
Rekonstrukce plynovodních přípojek. Připojování domovních plynovodů a jejich uvádění do provozu předpoklad schválení: 2019 |
7 | TIN 702 12 revision |
Přivařování záplat a odboček a záplat na potrubí VTL plynovodů pod tlakem plynu pro vybrané parametry dokončení z r. 2018 |
8 | TDG 919 01 revision |
Revizní kniha plynových spotřebičů předpoklad schválení: 2019 |
9 | TPG 920 26 revision |
Katodická ochrana potrubí uložených v zemi předpoklad schválení: 2019 |
10 | TPG 921 02 revision |
Vizuální hodnocení svarových spojů na plynárenských zařízeních z polyetylenu předpoklad schválení: 2020 |
11 | TPG 923 01 revision |
Certifikace procesů. Ověřování odborné úrovně a kvality práce v oblasti plynárenských zařízení předpoklad schválení: 2020 |
12 | TPG 934 02 Nová |
Měřicí stanice předpoklad schválení: 2019 |
13 | TPG 935 01 revision |
Trasové uzávěry plynovodů z ocelových trub předpoklad schválení: 2020 |
14 | TDG 983 01 revision |
Vtláčení bioplynu do plynárenských sítí. Požadavky na kvalitu a měření předpoklad schválení: 2019 |
Plan of the development of normative documents for 2018
(updated on 23 April 2018)
Serial number |
ND number | ND name |
---|---|---|
1 | TPG 201 01 Amendment 1 |
Plynová zařízení na podzemních zásobnících plynu předpoklad schválení: 2018 |
2 | TPG 700 21 revision |
Čichačky pro plynovody a přípojky předpoklad schválení: 2018 |
3 | TPG 702 01 Amendment 1 |
Plynovody a přípojky z polyetylenu předpoklad schválení: 2018 |
4 | TPG 702 04 Amendment 2 |
Plynovody a přípojky z oceli s nejvyšším provozním tlakem do 100 bar včetně předpoklad schválení: 2018 |
5 | TPG 702 04 revision |
Plynovody a přípojky z oceli s nejvyšším provozním tlakem do 100 bar včetně předpoklad schválení: 2019 |
6 | TIN 702 12 revision |
Přivařování odboček a záplat na potrubí VTL plynovodů pod tlakem plynu pro vybrané parametry předpoklad schválení: 2018 |
7 | TPG 800 03 revision |
Připojování odběrných plynových zařízení a jejich uvádění do provozu předpoklad schválení: 2018 |
8 | TPG 902 04 Amendment 1 |
Plynná paliva. Stanovení obsahu nečistot předpoklad schválení: 2018 |
9 | TPG 905 01 Amendment 5 |
Základní požadavky na bezpečnost provozu plynárenských zařízení předpoklad schválení: 2018 |
10 | TPG 913 01 Amendment 1 |
Kontrola těsnosti a činnosti spojené s řešením úniků plynu předpoklad schválení: 2018 |
11 | TPG 920 21 Amendment 1 |
Protikorozní ochrana v zemi uložených ocelových zařízení. Volba izolačních systémů předpoklad schválení: 2018 |
12 | TPG 921 23 cancellation |
Požadavky na svařovací zařízení pro polyfúzní svařování plastů předpoklad cancellation: 2018 |
13 | TPG 922 01 Amendment 1 |
Stavba, členění a úprava technických pravidel a technických doporučení předpoklad schválení: 2018 |
14 | TPG 923 01 revision |
Certifikace procesů. Ověřování odborné úrovně a kvality práce v oblasti plynárenských zařízení předpoklad schválení: 2019 |
15 | TPG 925 01 revision |
Bezpečnost a ochrana zdraví při práci v prostředí s nebezpečím výbuchu předpoklad schválení: 2019 |
16 | TPG 927 01 revision |
Odborné kurzy. Příprava osob ke zkouškám za účelem získání osvědčení odborné způsobi¬losti k montáži a opravám plynových zařízení předpoklad schválení: 2018 |
17 | TPG 935 01 revision |
Trasové uzávěry plynovodů z ocelových trub předpoklad schválení: 2019 |